Posted on Leave a comment

Type II Under Construction

Well today I pulled out my calipers and rulers. Its time to get all the correct holes drilled.

I am very cautious with the altimeter port’s I really want them to be as close to the middle of the Av Bay as possible and the correct size. So I am measuring 3 times and going to drill once.

The lower half of the rocket already has holes for the shear pins, and I will need to drill holes for the Plastic rivets.

Leave a Reply

Your email address will not be published. Required fields are marked *